Case Histories

Increase Energy Efficiency with a HRSG

HRSG
Papermill Carmignano
2021

  • Supply of 1 HRSG w/ Post-firing and Fresh-Air Firing downstream system  GT CX300
  • 28t/h of Saturated Steam @15 barg

Biomass-Fired WHR Project
Distillery Anagni
2020

  •  T/K Supplier of WHR project 
  • Downstream 50 MWth Biomass Fired Boiler 
  • Hot Water Loop,  Flue Gas Cooler
  • Flue gas flow 115,000 Nm3/h;  175°C
  • 2 MWth/h Thermal Energy recovered

T/K Supplier of HRSG & Engineering of WHR Project
Steel Mill Terni
2019

  •  T/K Supplier of HRSG portion of project to recover heat from exhaust flue gas downstream from WALKING BEAM Furnace, then returning flue gas to the existing chimney
  • HRSG for 26t/h 280°C Superheated  Steam @ 20 barg  
  • Basic engineering of WHR Project
whru laterlite
EPC for WHRU Project
Laterlite Rubbiano
2017-18
  •  T/K Supplier of WHR project 
  • Downstream 50 MWth Biomass Fired Boiler 
  • Hot Water Loop,  Flue Gas Cooler
  • Flue gas flow 115,000 Nm3/h;  175°C
  • 2 MWth/h Thermal Energy recovered
en_USEnglish
Powered by TranslatePress